
In addition, the house is scaffolded for the scratch coat of stucco. We actually need to make some final decisions on colors - specifically outdoors. The house will be ready for the garage door and the front door within the next two weeks. Wow. And then we're talking about flooring, trim and walls. Entering the home stretch. Running guess is that it's done right after Thanksgiving. That would be amazing (and on schedule). As long as we are in before 12/26, I am a happy camper. That's the last day on our lease and the less time I throw money away, the better.

By the end of this week, the house will have stucco and be partially drywalled - really fun. We're bracing to think every room is a lot smaller!
No comments:
Post a Comment